Aluminium gearbox housing: production steps
The route the part follows through the plant. VK-AD-2140 · Cast components.
Route through the plant
- 1Die design and simulation
- 2High-pressure die casting
- 3Trimming and heat treatment
- 45-axis CNC machining
- 5Leak test
- 6Washing and packing
Single-site production
Casting, heat treatment, machining and assembly share one site, so the part follows a defined route. Steps are representative; the route is confirmed at quote stage from the drawing and request.